Solutions to air streaks and incomplete filling (lack of glue) in molds

Solutions to air streaks and incomplete filling (lack of glue) in molds


The air streaks of the mold


Phenomenon: During the production process of transparent protective covers, thin layers of air streaks often appear near the water outlet.


Analysis: The raw material melt is prone to decomposition at high temperatures during shearing, generating gas. The high brightness of the mold surface is not conducive to the discharge of gas. The gas is drawn in through the water inlet due to the pressure drop.


(1)Characteristics of injection molding machines


Grade: HT-DEMAG, clamping force: 100t, plasticizing capacity: 150g.


(2) Mold characteristics


Mold ejection number: 1×2, glue injection method: point gate, top block ejection: Mold temperature: 100°C (constant temperature machine).


(3) Product characteristics


Material: PC, Color: Transparent, Product weight (single piece) : 1.5g, nozzle weight: 13g.


(4) Analysis of causes of defects


The main channel of the mold is quite large. The method of injecting glue is submersible. The molten material flows near the glue inlet. Due to the excessive speed and the high gloss of the mold surface, the high shear causes the molten material to heat up rapidly in an instant, resulting in the decomposition of the raw material and the generation of gas and pressure drop. The gas is drawn in through the water inlet, forming gas streaks.


(5) Countermeasures


1. Utilize multi-level injection and position switching


2. In the first section, fill the flow channel's glue inlet at a relatively fast speed and find the corresponding switching position. Then, in the second section, fill the area near the glue inlet at a slow speed and a very small position. In the third section, quickly fill 90% of the mold cavity to prevent the high-temperature molten rubber compound from cooling down. Finally, switch to the pressure-holding switch position and appropriately extend the pressure-holding time.



Injection molding process table

Injection molding machine: TMC 60T, Type B screw, injection capacity 133g

Product Name: Transparency

Raw material: PC LEXAN101

Color: Transparent

Drying temperature: 120°C

Drying method: Dehumidifying dryer

Drying time: 4 hours

Recycled material usage: 0

Finished product weight: 1.5g×8=12g

Nozzle weight: 13g

Mold output: 1×8

Gate injection method: Point gate

Barrel temperature

Mold temperature

Use machines

"Settings

"Actual
12345

before

Oil temperature control machine
100°C100°C
320°C315°C310°C285°C/

after

Oil temperature control machine100°C100°C


/4550

Holding pressure

Pressure-holding position
110110110

Injection pressure


/1.81.8

Holding pressure time

121623.625

Injection pressure position

Residual amount of injection glue



/
/1002
15Injection velocity
8.2

///



Intermediate time

Injection time

Cooling time

The entire duration

Back pressure

Rotational speed

Retraction speed

Material quantity position

Retraction position
51.31530510   15   1010253

Mold closing protection time

Supervise the feeding time

Clamping force

Ejection length

Ejection times

Rotation position

Blowing delay

Blowing time
11055045115   25   28//

Auto Mould_Taizhou Jiefeng Mould Co.,Ltd. (jfmoulds.com)

f096558309f8c3a8a13a8d8c87bb2c9

The mold is not fully filled (lacking glue)


Phenomenon: During the production process of electrical product bases, there is often a phenomenon of insufficient filling (lack of glue) at the bone position, right-angle position or fusion connection 

point.


Analysis: Insufficient filling caused by trapped air in the bone position (lack of glue); The connection point of the glue flow fusion is not fully filled (insufficient glue).


(1)Characteristics of injection molding machines


Grade: HT120T, Clamping force: 120t, plasticizing capacity: 150g.


(2) Mold characteristics


Mold ejection number: 1×1, injection method: point gate, ejection method: Ejection by ejector pin, mold temperature: 100°C (constant temperature machine).


(3) Product characteristics


Material: ABS UT10B, Color: black, Product weight (single piece) : 6.3g, nozzle weight: 5.2g.


(4) Analysis of causes of defects


The mold's glue feeding method is two-point submersible glue feeding. If the material flow rate is too fast, it is easy to cause air entrapment at the right Angle of the bone position, resulting in incomplete filling (glue shortage). If the material flow speed is too slow, it is easy to cause incomplete filling (lack of glue) at the end of the material flow fusion line.


(5) Countermeasures


1. Utilize multi-level injection and position switching.


2. In the first section, fill the flow channel at a moderate speed through the glue inlet and the corresponding switching position. Then, in the second section, fill it quickly to the vicinity of the bone position and find the corresponding switching position. In the third section, fill the bone position at a slow and short speed to facilitate gas discharge. Finally, fill it quickly and switch to the pressure holding switching position, and appropriately extend the pressure holding time.


Injection molding process table

Injection molding machine: HT-120T, injection capacity 150g

Product Name: Protective Base

Raw material: ABS UT10B

Color: Transparent

Drying temperature: 120°C

Drying method: Dehumidifying dryer

Drying time: 4 hours

Recycled material usage: 0
Finished product weight: 6.3g

Nozzle weight: 5.2g

Mold output: 1×1

Gate injection method: Point gate

Barrel temperature

Mold temperature

Use machines

"Settings

"Actual
12345

before

Oil temperature control machine
100°C100°C
235°C220°C215°C195°C/

after

Oil temperature control machine100°C100°C

Intermediate time

Injection time

Cooling time

The entire duration

Back pressure

Rotational speed

Retraction speed

Material quantity position

Retraction position
51.31032510   15   1010 323

Mold closing protection time

Supervise the feeding time

Clamping force

Ejection length

Ejection times

Rotation position

Blowing delay

Blowing time
11090045115   32    35//

Commodity Mould_Taizhou Jiefeng Mould Co.,Ltd. (jfmoulds.com)

Related News

Solutions to the problems of hard rubber indentation, row position demolding and inconsistent product dimensions in molds
Solutions to the problems of hard rubber indentation, row position demolding and inconsistent product dimensions in molds

2025-08-29

Solutions to the problems of hard rubber indentation, row position demolding and...

Injection molds: The Cornerstone and Future Trend of Precision Manufacturing
Injection molds: The Cornerstone and Future Trend of Precision Manufacturing

2025-07-12

Injection molds: The Cornerstone and Future Trend of Precision ManufacturingBasi...

Solutions for air marks at the water outlet position of the mold and drag damage at the water outlet position of the battery frame
Solutions for air marks at the water outlet position of the mold and drag damage at the water outlet position of the battery frame

2025-08-27

Solutions for air marks at the water outlet position of the mold and drag damage...

How can the top white and surface elevation of the mold be solved
How can the top white and surface elevation of the mold be solved

2025-08-26

How can the top white and surface elevation of the mold be solvedThe top white o...

Solutions for air streaks, charring, wire jamming, height elevation or trapped air in molds
Solutions for air streaks, charring, wire jamming, height elevation or trapped air in molds

2025-08-14

Solutions for air streaks, charring, wire jamming, height elevation or trapped a...

The solution to the problem of the lens length dimension of the mold being too large and the water line being clamped on the side of the middle hole position